Cost
What is the hourly rate for an excavator with an operator?
$185 to $325 an hour around San Bernardino, plus mobilization of $300 to $850 per job.
What does a pool dig cost?
$3,000 to $8,500 for the excavation. Pool removal runs $7,000 to $30,000 depending on partial or full removal.
What does it cost to haul dirt away?
$175 to $400 a truckload depending on distance and whether the load is clean fill.
Why does a deep trench cost more per foot than a shallow one?
At 5 feet Cal/OSHA Title 8 section 1541.1 applies to any trench a worker enters: a trench shield, shoring or sloped walls, a ladder within 25 feet and the spoil set back 2 feet from the edge. A sewer lateral 7 feet down in the street is that trench, and the shield and the slower pace land on your quote.
Timing
How soon can a job start?
After the permit if one is needed, and at least two working days after the DigAlert ticket, whose marks stay good for 28 days. Simple jobs without a permit can start within a week or two.
How long does an ADU pad take?
Usually one to three days of machine work, plus compaction testing and inspection.
How this works
Is Del Rosa Excavation a contractor?
No. It is a referral service with no contractor license. We pass your request to one licensed contractor who quotes and does the work.
Do I pay anything for the referral?
No. The contractor pays us for the introduction.
Will I get calls from several companies?
No. Your request goes to one contractor only.
Still have a question? Ask the contractor
Send the address and the job and one licensed contractor calls within one business day.